-
Case Study, Projects
Case study roofs
Trafalgar Terrace This was a slate roof renewal in a conservation area, incorporating flat roof renewal. The time taken to complete project was seven days. …
Case Study: Roof, West Street
A typical small cottage, here we used the Del Carmen slate again and carried out all the Planning and Building Control requirements and replaced a …
Case Study: Loft Conversion, Rayners Lane
Our client is a building surveyor who did his own drawings and knew every square inch of his design. No pressure then for us! This …
Case Study: Single Storey Extension, Nelson
At London Building Renovation we are proud to be part of the business community on Harrow on-the-Hill. Harrow on-the-Hill is picturesque and, as is well …
Case Study: Victoria Terrace
We renewed this roof as part of a larger refurbishment project using the Del Carmen slate. Planning application and Building Control were handled through the …
Case Study: Wellington Terrace
About five years ago LBR took down the side of this house and re-built it in very carefully managed stages. The whole project was carried …
Case study: 67 West Street, Harrow on the Hill
This house is in the same road as our office. The clients came to us with a damp problem and we went to inspect, to …
Case Study: Ground Floor Extension, Drury Rd
The clients had already had a loft conversion carried out by a different building contractor, but not being entirely happy had sought a different contractor …